شرکت مهندسین مشاور سازآب اهواز

Ongoing Projects of the Company

Arc and Ladle Furnaces Cooling Water Hydraulic Analysis

Due to the environmental pollution caused by Ladle Furnace hood no.4 and considering modifications to the LF 4 hood design to resolve the existing problem, Khuzestan Steel Company intends, as part of its development plans, to take necessary action for other ladle furnaces but this modifications will cause big changes in Cooling water networks of arc and ladle furnaces. So Sazab Ahwaz Co, analized the hole cooling water system to propose changes in networks sizing to solve the problems.

مطالعات تحلیل هیدرولیکی کل خطوط شبکه آب خنک سازی کوره ها و کوره پاتیلی ها
مطالعات تحلیل هیدرولیکی کل خطوط شبکه آب
Scroll to Top