In line with the development plans of Khuzestan Steel Company, including the construction of a new switchgear, Substation 801, wide slab unit, Furnace No. 7, SVCF, and other facilities, the study of the chilled water distribution network covered by Chiller House No. 4 has been placed on the agenda of Khuzestan Steel Company’s management. Since cooling systems or equipment requiring chilled water are necessary for cooling these units and their equipment, chilled water supply must be considered accordingly. Based on the studies conducted on water supply projects for SVC units and the cooling studies of the new and existing switchgear buildings and the related control room, supplying the required chilled water for the aforementioned units from Chiller Houses No. 2 and No. 3 has been determined to be infeasible.”At present, the Phase I study report and the hydraulic analysis corresponding to the consumers and the chilled water distribution network covered by Chiller House No. 4 have been completed, and the related results have been submitted